ASP MTL
I would like to say how well LCS have performed at Bishops Norton, following a successful FAT test we have completed the SAT sign off on site in 12 days which included 3 days E2E testing over Modbus. Having a fully operational ASP circulating flows in readiness for the SAS tanker deliveries to seed the ASP on the 17th October including interface testing to the Huber SAS thickening plant which will be commissioned in early November.
Credit where credit is due…
Yodel PLC Update
I’d like to express my sincere thanks to the whole team at LCS who completed the project. The time scale given to LCS for the design and build of the PLC was extremely small and coupled with the set installation period made this project what we thought very challenging. But right from day one when they took on the project it was handled with complete professionalism. With good communication throughout the whole process, through to the successful completion of the project on time.
Challenging Timescales
I would like to pass on my gratitude to LCS for the work completed on the above project. The task of upgrading the machinery to the required standard, within the tight timescale we had set out was always going to be challenging, but all at LCS involved approached and completed the project with upmost professionalism. The project threw up a number of unique problems that were quickly overcome and all work was completed according to the criteria set out by the scope of works.
Every member of staff involved in this project are deserving of thanks however I would like to pass on my special thanks to Thomas, Barry and Mario who spent a lot of time on site ensuring that the project was a success.
Sincere Thanks
I’d like to pass on my sincere thanks for the excellent work completed by LCS on the above project. The job had the potential to be extremely testing due to the condition of the original panels and the lack of available information. It would be fair to say that this was the highest risk upgrade project that I have been involved in to date.
All of your staff involved in this work have been a credit to LCS but Russell deserves a special mention for the effort and expertise he put into the job to ensure that the project was a success and that the equipment was available for production ahead of schedule.
Hook STW
At this point, I would also like to add that the LCS Engineers have been amazing during this current commissioning period at Hook.
It has been a pleasure working alongside him.
Bishops Green BHPS
I would like to add a big well done and my personal thanks to everyone in helping achieve this date which has been a significant achievement to say the least. “Project Manager”
Ditchling WWSW
Gent’s
A very fine example of collaborative working. For what it is worth THANKS
Area Manager
Headcorn
Please send my thanks to the LCS Engineer for his work on site, my commissioning guy has nothing but positive comments.
Project Manager
Nippon
Hi,
Just been into NEG . Spoke to NEG and he was singing praises of LCS personnel who did last 2 jobs and we have a great reputation here and they are keen to include us in future projects
Kind regards,
Thomas Lavelle
Sales Manager (Lyle Control Systems)
Weetabix
I would also like to take this opportunity to say what a good job LCS has done with the software.
Loganbarns
I had a call from the client this week to express how happy they were to close out all the snags on site and your workmanship.
Commissioning engineer said it was great working with us.
Site is now being handed over to SW and complete
Thanks again
Regards,
Emily Carr
Contracts Manager
Stags Common
Galliford Try passed on how well Jeff and Mick performed on site at Stags Common and asked for his commendation to be passed on. The site team were very impressed with how fast and efficient they worked only requiring one shut down to fit the extension panel.
Area Commissioning Manager
ISO 9001 & ISO14001
…” The organisation is working to change their culture and improve reporting of quality, environmental and health and safety incidents and NCs..”
…” Thank you to Lyle Control Systems for your welcome and openness during the audit…”
ISO18001
“…it is clear that LCS has a robust Health and Safety Management system in place …”
…” Good evidence of satisfactory implementation of occupational health and safety management system…”
LCS Has …
…”demonstrated to the audit team that the management system is effective in its ability to systematically achieve the requirements for products and or services within the scope of its activities and in accordance with its policy and objectives.. “
CMDP – Brede – MEICA Manager
Just wanted to say a massive thanks for all the blood, sweat and tears you put in at Brede to help us get to this stage.
Add your testimonial